Length: km, Costs: 1423 Mio. Euro (Source: EU 2005)
Kurzbeschreibung: Construction of high-speed railway link between the french border and Bruxelles. The section came into operation in 1997, linking Burxelles with Lille, Paris and London (via Channel Tunnel).