BUND TEN/TEN Projekte/PP03: High-speed railway axis of south-west Europe

Madrid-Valladolid-Burgos-Vitoria-Irún/ Hendaye

Rail projects

Type: new

in preparation/under construction

 

Country: France, Spain

 

Length: 652 km, Costs: 8581 Mio. Euro (Source: EU 2005)

 

Kurzbeschreibung: Construction of new high-speed railway line between Madrid and the French border, eventuelly connecting the Spanish high-speed rail network to the French TGV-network. Construction works on the Spanish sections are expected to be finished in 2010.

 

Freier Text: TEN-T contributions up to the end of 2004: 42 mio EUR.