Length: 171 km, Costs: 3331 Mio. Euro (Source: EU 2005)
Kurzbeschreibung: Construction of new high-speed line between Nürnberg and Ingolstadt, allowing speeds up to 300 km/h. Upgrade of line between Ingolstadt and München, allowing maximum speeds of 200 km/h. Completion of the main works in 2006.
Freier Text: TEN-T contributions up to the end of 2004: 179,5 mio EUR.